The design of a completely independent Containmet, which includes all aspects of the data center, is no longer practical and economical and has not been built before.
For the new data center, as well as to the upgrading of existing data center, choose before with the size of the data center solutions used has been adopted (with related drawings, subsystem or system design scheme is the most sensible thing to do.)
Choose the past classic design as a new project in project design reference basis, to the project itself and the data center optimization of the overall scheme design and subsequent data center to run the life cycle of the whole will have a positive impact.
The past solutions used as reference to set up in the new project or to upgrade existing data center, can simplify the project cycle, shorten the planning and implementation process, and reduce the risk of data center after running down.
The following is a description of the definition and advantages of the reference design.
To build a data center faster, you need to have a strong incentive to plan and delegate to a third party.
However, due to the limited budget, shortage of staff, the early can't clear IT load, other dynamic change, from the design point of view put forward high availability is not compromise, and so on practical problems, make extremely difficult to achieve this goal.
Planning and building data center realistic planning is key.
However, in the data center project construction process, "system planning is likely to be a fatal weakness in the implementation of data center projects.
Once the system planning mistakes, you will be in the later construction, the implementation stage amplifier and spread continuously, is likely to lead to system delay, construction costs, delays, and eventually involving system appear likely problem.
When planning for a data center, this tool can help planners avoid some potential pitfalls during early planning.
Usually, the reference to design the blueprint of the system is usually a reference to previous project, including the system schematic diagram, chart, (ideally), at the same time also includes a detailed list of all systems of material or component.
Although the reference design can be implemented directly, more typically, it can be used as a benchmark to meet specific user preferences or constraints.
The reference design may be used for a complete data center, or IT may be limited to a system in a data center, such as an IT machine room, power equipment, or cooling system.
A variety of directories to choose from are designed to allow users to quickly find the design best suited to their needs and require minimal adaptation to their specific projects.
Reference design is based on recommended and proven best practices.
For example, the manufacturer of electrical components often provides reference designs for their products to help their customers become more efficient in their own project applications.
The reference design also exists in the physical infrastructure system of the data center, and can provide the advantages of the electrical original and housing design mentioned just now.
Data center reference design as a starting point provides some valuable Suggestions for the project team, including:
Promote and simplify the planning stage
Reduced planning time
Reduce risk, provide forecast for future risks and improve reliability
What is the data center reference design?
What it contains and explains how the benefits listed above are implemented one by one.