The integrated wiring of automatic transfer system is a complex project, and the quality of the project directly affects the performance of the network link. In the implementation of the project, the following points need attention.
1, the overall wiring system must be designed in advance, with civil, fire, air conditioning, lighting and other installation works together, so as not to produce unnecessary construction conflict.
2, under the conditions permit, the weak should go their own weak wells, reduce the chance of electromagnetic interference, floor wiring room and mainframe room should be arranged as much as possible for the development and maintenance of the required. For networks, the laying of physical layers is critical because it is the foundation.
3, try to 'at some point, the double panel (a speech, a data), with power with the good, in the information near the source point of cloth. Because it is a one-time in the project of integrated wiring line in general, good cloth, to change the wiring is difficult, but with the development of communication equipment is more and more, so some of the more secure duobu.
4, don't make integrated wiring too idealistic, don't put some of the more specific network also integrated into the integrated wiring. Integrated wiring, the telephone network, computer networks, building automation network integration is enough.
5, along with the rapid development of network equipment, the selection scheme should be open, by more than five or five categories, to ensure the data and voice can be exchanged by optical fiber cable vertical logarithmic increase, for some large buildings, should be used to do data backup instead of using optical fiber cable.
6, because the light product prices continue to drop, large bay wiring should be considered 'points of light so favorable for network construction.
7, laying DG pipe to use larger diameter, to leave margin. Cable should pay special attention to the turning radius, turning radius is too small will cause serious loss of check each link, a fiber optic cable, light box panel special contacts, some of the panel of the box is not enough depth to spot after doing not installed on the panel to the box is good, installed after the test is not good, the reason is installed after the cable radius is too small, causing serious loss.
8, with the price of light welding equipment, to local conditions, can give ST and SC method of making traditional head into the fiber pigtail and phase welding practices can ensure optical quality.
9, not one-sided pursuit of wiring products brand, in recent years, in fact, the performance of network equipment non shielding wire, some domestic manufacturers of cable, module on other has reached the industry standard, the price has a larger advantage, so we can consider the use of their products.
The above points are frequently encountered in engineering. In fact, the integrated wiring is not a difficult to understand the project, as long as the principle of understanding it, a lot of comparison of product performance, we will be able to make affordable systems.