Many companies have been plagued by data center migration and power outages, such as power outages at the Delta Airlines Inc data center, resulting in an economic loss of up to 150 million dollars. Another example of American super bowl games off, delay the schedule.
In the operation process, the data center is facing many challenges, such as the operation cost of the data center, before this requires the establishment of data center, budgeting and planning, such as rising energy costs by cloud hosting, rising energy costs can be alleviated through the use of new technology, such as virtualization and cloud hosting, can greatly reduce the the cost of energy.
For example, maintenance and cooling requirements, data center facilities and components need to work continuously at suitable temperatures throughout the day, which requires a complete cooling system to maintain the required temperature.
In fact, the data center is also facing the integration of communication and infrastructure requirements, lack of resources, efficiency, security, server data center network congestion and other challenges, in which data center challenges also occupies an important position, so what is the reason for failure, operator misoperation, power outages, there may be a heavy load of server that leads to the collapse of the system.
Although data center outages are very serious problems, we still hope that there is a solution.
Here, we need to identify some problems.
Follow a change in the data center, power system upgrade
Can be said that the different stages of the data center, the power demand is constantly changing, such as increasing the server or switch may have a huge demand for electricity, so to grasp the power demand of the data center in this period of time, become very important. In addition, it is necessary to evaluate the power supply of the data center reasonably, so as to avoid the overload of the data center and the shortage of power supply.
Know everything all interconnection equipment and systems
For data center operations, it is essential to record the power chain together, from the power into the building, and then to all rack equipment through UPS and PDU/.
This means that data center operations need to know which power related devices, as well as the interdependencies of their devices. This allows data center operations to understand the potential impact of some device failures or offline maintenance. In addition, each supply chain should also understand the status of equipment.
Through the use of data center infrastructure management (DCIM) for power management. DCIM enables data center operations to operate data centers with the highest efficiency, while allowing all relevant personnel to improve the overall operation, and identify vulnerabilities, so as to maintain the security of the power chain.
Deployed DCIM also allows data center operations to fully understand their own products, through the sharing of real-time data and easy to understand charts, eliminate communication silos between IT and facilities.
Make sure that the power system is not under attack or threat
The data center is connected through the network, of course, in addition to the frame contained in the terminal and the access point, many channels may be the destruction of the data center, so the protection of these channels from damage, become a need to consider the problems in the construction of data center.
Here, network attacks become a possibility, many hackers may not directly destroy the power supply system, but through the network into the data center, in order to destroy the data center power supply purposes.
In addition, we should not only prevent damage to the data center through the network means hackers should also prevent insider damage, some of the staff because of their own lack of experience, a small error may lead to interruption of data center power supply.
Therefore, it is very important to establish maintenance documentation and process control in order to prevent the destruction through the above means. Here, using more hardware is not the best choice to prevent catastrophic power outages, you might as well use software level management, to be more secure.
May wish to analog fault safety test, a complete disaster recovery plan
The data center in the process of operation, will inevitably be some so-called fault, there is no risk of equipment, in the real bug, met before or have simulated error of the scene, it is more experience to deal with the fault. Here, we suggest that in does not affect the business environment of the data center power test, using the virtual switch equipment, will allow the data center operators can deal with the worst case, and carries on the recovery.
Data center staff always assume that their power supply chain and power backup system is foolproof, but if there is no fail safe test, what will be the result? Power failure simulation allows data center operators to find a lack of redundant facilities and find single point of failure. However, this requires documentation. As a result, data center operators set up a power fail test mechanism and record their recovery process before catastrophic power failure.